Friday, May 01, 2015

Appendices for the Draft Environmental Impact Report CALAM MONTEREY PENINSULA WATER SUPPLY PROJECT, April 2015

ABSTRACT: The Appendices for the Draft Environmental Impact Report CALAM MONTEREY PENINSULA WATER SUPPLY PROJECT, April 2015, as follows, in the following Posts:

Appendix A NOP and NOP Scoping Report (57 pages)

Appendix B1 MPWSP Plant Sizing Data: Various Five- and Ten-Year Normal, Dry, and Maximum Month Demand Scenarios (10 pages)

Appendix B2 State Water Control Board – Final Report on Analysis of Monterey Peninsula Water Supply Project (279 pages)

Appendix C1 Analysis of Historic and Future Coastal Erosion with Sea Level Rise (25 pages)

Appendix C2 Coastal Water Elevations and Sea Level Rise Scenarios (8 pages)

Appendix C3 Exploratory Borehole Results (438 pages)

Appendix D1 Far-Field Analysis of Brine Discharge (150 pages)

Appendix D2 Brine Discharge Diffuser Analysis (51 pages)

Appendix D3 Water Quality Analysis of the Discharges (32 pages)

Appendix D4 Ocean Plan Compliance Assessment (52 pages)

Appendix E1 Test Slant Well Groundwater Modeling and Analysis – CEMEX Active Mining Area (48 pages)

Appendix E2 Monterey Peninsula Water Supply Project Groundwater Modeling and Analysis (551 pages)

Appendix F Special-status Plant and Wildlife Species Considered (20 pages)

Appendix G Air Quality and Greenhouse Gas Emissions Calculations (33 pages)

Appendix H Pure Water Monterey Groundwater Replenishment Project, Project Description (140 pages)

Appendix I Component Screening Results
(14 pages)

Appendix J1 Coastal Water Project EIR Analysis: MPWMD 2006 Estimate of Long-Term Water Needs Compared with Growth Anticipated in Jurisdictions General Plans (37 pages)

Appendix J2 Secondary Effects of Growth (26 pages)

No comments: