UPDATE: Mission Trail Rails/Post Repair cost $600.00, according to the City's April 2008 Check Register, as follows:
Carmel-by-the-Sea
April 2008 Check Register
(Includes checks dated 3/25/08-3/31/08)
115094 3/25/08 KNA GENERAL CONSTRUCTION $ 600.00 MISSION TRAIL RAILS/POST REPAIR
ABSTRACT: BEFORE and AFTER photos of the Mission Trail Nature Preserve Pedestrian Bridge near the Mt. View Av. entrance are shown. The reconstruction/repair to this pedestrian bridge was done after the reconstruction of the grapestake fence along Mt. View Av. and Santa Rita St. at Forest Theatre, accomplished by the same man. It appears he and his trailer have left the area and will not continue reconstruction work on the much needed grapestake fence along Josselyn Lane at the Forest Theatre.
BEFORE
Storm damage to Mission Trail Nature Preserve Pedestrian Bridge, Mt. View Entrance, January 2008.
AFTER
Reconstruction/repair to Mission Trail Nature Preserve Pedestrian Bridge, Mt. View Entrance, March 2008.
AFTER
Close-up of reconstruction/repair of Pedestrian Bridge in Mission Trail Nature Preserve, March 2008.
2 comments:
Please advise on the fence along Josselyn Lane at the back of the Forest Theater property near the rear benches. This part of the fence has been in poor shape long before the storms of last January. Why isn't the man continuing his work on this section of fence? He has done a great job on the fence along Mtn. View Av. and Santa Rita St.
Since only the hour is reflected on all postings and no date is displayed along with it, I am unable to tell how long ago the inquiry re fence along Josselyn Trail was posted. As of the beginning of April, the fence along Josselyn has been repaired, not long after the other stages of repair had been done on the perimeter fencing.
Post a Comment