Friday, March 07, 2014

Proceeding Number A.12-04-019 REPLY BRIEF BY WATER PLUS

ABSTRACT: Re: In the Matter of the Application of California American Water Company (U 210 W) for Approval of the Monterey Peninsula Water Supply Project and Authorization to Recover All Present and Future Costs in Rates, REPLY BRIEF BY WATER PLUS document is embedded. Conclusion For these reasons, Water Plus urges the Commission to (a) adopt only the requirement for hydrologic testing in the settlement agreement, (b) adopt the sizing agreement modified to take the ongoing drought into account by requiring that the capacity of the proposed desalination plant be sufficient to meet the entire local demand for water, (c) require Cal Am to amend its water-supply proposal to include mitigation for the difference in energy requirements between sub-seafloor and open-ocean intake, and (d) deny the proposal if either of the competing projects shows a reasonable chance to materialize.
Filing Date 02-14-14
REPLY BRIEF BY WATER PLUS

No comments: