Showing posts with label 2017 CALAM MONTEREY PENINSULA WATER SUPPLY PROJECT Draft Environmental Impact Report Environmental Impact Statement. Show all posts
Showing posts with label 2017 CALAM MONTEREY PENINSULA WATER SUPPLY PROJECT Draft Environmental Impact Report Environmental Impact Statement. Show all posts

Sunday, January 15, 2017

CALAM MONTEREY PENINSULA WATER SUPPLY PROJECT Draft Environmental Impact Report/Environmental Impact Statement, Prepared for California Public Utilities Commission and Monterey Bay National Marine Sanctuary, January 2017

STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION
Monterey Peninsula Water Supply Project
(Application A.12-04-019, filed April 23, 2012)

Draft Environmental Impact Report/Environmental Impact Statement

Cover [pdf], Dear Reviewer Letter [pdf], Table of Content [pdf], and List of Acronyms [pdf]

Calam Mpwsp Deir-eis by L. A. Paterson on Scribd

Cover, Dear Reviewer Letter, Table of Content, and List of Acronyms

Executive Summary [pdf]
Executive Summary by L. A. Paterson on Scribd


Executive Summary
Executive Summary

1. Introduction and Background [pdf]
 CalAm MPWSP DEIR-EIS CHAPTER 1 Introduction and Background by L. A. Paterson on Scribd

1. Introduction and Background

2.  Water Demand, Supplies, and Water Rights [pdf]
CalAm MPWSP DEIR-EIS CHAPTER 2 Water Demand, Supplies, And Water Rights by L. A. Paterson on Scribd

2.  Water Demand, Supplies, and Water Rights

3. Description of the Proposed Project [pdf 6.18mb]
CalAm MPWSP DEIR-EIS CHAPTER 3 Description of the Proposed Project by L. A. Paterson on Scribd

3. Description of the Proposed Project

4.  Environmental Setting (Affected Environment), Impacts, and Mitigation Measures
     4.1   Overview [pdf]
     4.2   Geology, Soils, and Seismicity [pdf 3.23mb]
     4.3   Surface Water Hydrology and Water Quality [pdf 3.83mb]
     4.4   Groundwater Resources [pdf 6.01mb]
     4.5   Marine Resources [pdf1.49mb]
     4.6   Terrestrial Biological Resources [pdf 9.01mb]
     4.7   Hazards and Hazardous Materials [pdf]
     4.8   Land Use, Land Use Planning, and Recreation [pdf1.37]
     4.9   Traffic and Transportation [pdf]
     4.10 Air Quality [pdf]
     4.11 Greenhouse Gas Emissions [pdf]
     4.12 Noise and Vibration [pdf 1.13mb]
     4.13 Public Services and Utilities [pdf]
     4.14 Aesthetic Resources [pdf 1.39]
     4.15 Cultural and Paleontological Resources [pdf 1.14]
     4.16 Agriculture and Forestry Resources [pdf]
     4.17 Mineral Resources [pdf]
     4.18 Energy Conservation [pdf]
     4.19 Population and Housing [pdf]
     4.20 Socioeconomics and Environmental Justice [pdf]

4.  Environmental Setting (Affected Environment), Impacts, and Mitigation Measures

5.  Alternatives Screening and Analysis
     5.1  Introduction and Overview [pdf 1.12mb]
     5.2  Alternatives Not Evaluated in Detail [pdf 1.12mb]
     5.3  Alternatives Development, Screening and Evaluation Process [pdf 1.12mb]
     5.4  Description of Alternatives Evaluated in Detail [pdf 1.93mb]
     5.5  Alternatives Impact Analysis [pdf 4.25mb]
     5.6  Environmentally Superior Alternative/Preferred Alternative [pdf]

5.  Alternatives Screening and Analysis

6.  Other Considerations [pdf]
Calam Mpwsp Deir-eis Chapter 6 Other Considerations by L. A. Paterson on Scribd

6.  Other Considerations

7.  Report Preparation [pdf]
Calam Mpwsp Deir-eis Chapter 7 Report Preparation by L. A. Paterson on Scribd

7.  Report Preparation

8.  Index [pdf]
Calam Mpwsp Deir-eis Chapter 8 Index by L. A. Paterson on Scribd

8.  Index

Monterey Peninsula Water Supply Project Draft Environmental Impact Report/ Environmental Impact Statement, January 2017

STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION
Monterey Peninsula Water Supply Project
(Application A.12-04-019, filed April 23, 2012)
PUBLIC NOTICE OF AVAILABILITY
Draft Environmental Impact Report/Environmental Impact Statement for the Monterey Peninsula Water Supply Project
State Clearinghouse No. 2006101004

Draft Environmental Impact Report/Environmental Impact Statement
  • To view the complete DEIR/EIS without appendicies, click here [pdf 49.1mb].
  • To view the Appendices for the DEIR/EIS, click here [pdf 127mb].

Cover [pdf], Dear Reviewer Letter [pdf], Table of Content [pdf], and List of Acronyms [pdf]


Executive Summary [pdf]

1.  Introduction and Background [pdf]

2.  Water Demand, Supplies, and Water Rights [pdf]

3.  Description of the Proposed Project [pdf 6.18mb]

4.  Environmental Setting (Affected Environment), Impacts, and Mitigation Measures
     4.1   Overview [pdf]
     4.2   Geology, Soils, and Seismicity [pdf 3.23mb]
     4.3   Surface Water Hydrology and Water Quality [pdf 3.83mb]
     4.4   Groundwater Resources [pdf 6.01mb]
     4.5   Marine Resources [pdf1.49mb]
     4.6   Terrestrial Biological Resources [pdf 9.01mb]
     4.7   Hazards and Hazardous Materials [pdf]
     4.8   Land Use, Land Use Planning, and Recreation [pdf1.37]
     4.9   Traffic and Transportation [pdf]
     4.10 Air Quality [pdf]
     4.11 Greenhouse Gas Emissions [pdf]
     4.12 Noise and Vibration [pdf 1.13mb]
     4.13 Public Services and Utilities [pdf]
     4.14 Aesthetic Resources [pdf 1.39]
     4.15 Cultural and Paleontological Resources [pdf 1.14]
     4.16 Agriculture and Forestry Resources [pdf]
     4.17 Mineral Resources [pdf]
     4.18 Energy Conservation [pdf]
     4.19 Population and Housing [pdf]
     4.20 Socioeconomics and Environmental Justice [pdf]

5.  Alternatives Screening and Analysis
     5.1  Introduction and Overview [pdf 1.12mb]
     5.2  Alternatives Not Evaluated in Detail [pdf 1.12mb]
     5.3  Alternatives Development, Screening and Evaluation Process [pdf 1.12mb]
     5.4  Description of Alternatives Evaluated in Detail [pdf 1.93mb]
     5.5  Alternatives Impact Analysis [pdf 4.25mb]
     5.6  Environmentally Superior Alternative/Preferred Alternative [pdf]

6.  Other Considerations [pdf]

7.  Report Preparation [pdf]

8.  Index [pdf]

Appendices

A.  NOP and NOP Scoping Report [pdf]

A1.  Draft EIR/EIS Distribution List [pdf]

B1. MPWSP Plant Sizing Data: Various Five- and Ten-Year Normal, Dry, and Maximum Month Demand Scenarios [pdf]

B2. State Water Board Final Analysis of the Monterey Peninsula Water Supply Project [pdf 16.1mb]

C1. Coastal Water Elevations and Sea Level Rise Scenarios [pdf 7.0mb]

C2. Analysis of Historic and Future Coastal Erosion with Sea Level Rise [pdf 2.10mb]

C3. Exploratory Borehole Results [pdf 53.3mb]

D1. Modeling Brine Disposal into Moterey Bay [pdf 1.98mb]

D2. Brine Discharge Diffuser Analysis [pdf]

D3. Ocean Plan Compliance Assessment [pdf 2.25mb]

E1. Lawrence Berkeley National Laboratories Peer Review [pdf 1.14mb]

E2. Draft North Marina Groundwater Model Review, Revisions, and Implementation for Future Slant Well Pumping Scenarios [pdf 32.4mb]

F.  Special-status Plant and Wildlife Species Considered [pdf]

G1.  Air Quality and Greenhouse Gas Emissions Calculations [pdf 1.74mb]

G2.  Trussel Technologies Inc. Technical Memorandum, Response to CalAm MPWSP DEIR [pdf]

H.  Pure Water Monterey Groundwater Replenishment Project, Project Description [pdf 12.3mb]

I1.  Open-Water and Subsurface Intakes [pdf]

I2.  Component Screening Results - Component Options Not Carried Forward [pdf]

J1. Coastal Water Project EIR Analysis: MPWMD 2006 Estimate of Long-Term Water Needs Compared with Growth Anticipated in Jurisdictions General Plans [pdf]

J2. Secondary Effects of Growth [pdf]

K. Existing Water Conservation and Water Recycling [pdf]

REFERENCES:
STATE OF CALIFORNIA
PUBLIC UTILITIES COMMISSION
Monterey Peninsula Water Supply Project
(Application A.12-04-019, filed April 23, 2012)

Project Description

Announcements & Schedule

Comments & Documents