Tuesday, July 07, 2015

California Coastal Commission Executive Director’s Determination RE: Condition Compliance – Special Condition #11 of Coastal Development Permits (“CDPs”) A-3-MRA-14-0050 and 9-14-1735 for California American Water’s (“Cal-Am’s) slant test well project in Marina, Monterey County

ABSTRACT: In a letter from Charles F. Lester, Executive Director, California Coastal Commission, to Ian Crooks, P.E., Engineering Manager, California American Water Company, dated July 3, 2015, Dr. Lester states in the Executive Director’s Determination, as follows: Special Condition 11 requires, in part, that Cal-Am stop its pump test if monitoring shows more than a 1.5-foot decrease in water levels at Monitoring Well 4. It also requires the HWG to examine the monitoring data to determine the causes of the water level decrease and to submit its determination to the Executive Director. We reviewed the above-referenced letter, along with the HWG’s follow-up June 22, 2015 letter, weekly monitoring reports, and a June 25, 2015 submittal by Remy Moose Manley, all of which address various aspects of the pump test, monitoring results, aquifer characteristics, and regional and seasonal pumping regimes. The June 22nd HWG letter notes that there are likely several influences other than Cal-Am’s pump test, but that the test could be responsible for about 0.2 to 0.5 feet of the decrease.2 Based on our review, we have determined that the water level decrease appears to be caused in part by the pump test. Pursuant to Special Condition #11, Cal-Am must therefore submit an application for a permit amendment to allow restart of the test and is not to conduct further pump testing until receiving an amended permit. However, we understand that minimal maintenance pumping, of no more than 6 hours once per week, is required to maintain the well and its related equipment. This maintenance pumping is allowed prior to the Commission’s action on an amendment to Cal-Am’s permit. We understand you will notify us of the start and stop times for each of these maintenance cycles.With the benefit of several months of monitoring data obtained before, during, and after the pump test, including data Cal-Am is continuing to collect, we believe the current permit and its conditions can be modified to better reflect aquifer conditions identified through these data, to better characterize other factors affecting the aquifers, and to better identify the potential effects of the pump test as they relate to those factors. We therefore recommend Cal-Am work with the HWG to develop a proposed amendment that incorporates the analyses and information referenced above and that addresses the following:
• Characterization of local/regional effects: The available data suggest the monitoring results are affected by several elements other than the pump test – e.g., regional pumping regimes, daily changes in agricultural pumping, etc. We recommend the application for the proposed amendment identify and incorporate the likely effects of those elements on the data. For example, the HWG surmises that a regular pattern observed in the data is due to seasonal increases in agricultural pumping, of pumping being reduced on Sundays, etc. We recommend the application include available data to support those assumptions.
• Effects on different aquifers: The available monitoring data show that the three aquifers underlying the area have different characteristics – e.g., confined, semi-confined, and unconfined – and are affected differently by the pump test and the other factors. We recommend that Cal-Am consider whether the application should include separate, specific thresholds that can be used to measure the potential effects of the test well on each of the aquifers.
• Water and TDS levels: The available monitoring data suggests the changes in water and TDS levels may be better described not as single values but as a range or trend in the data. We recommend that Cal-Am consider whether the application should include proposed thresholds that better reflect the identified trends in the monitoring data.
In addition, and as noted in the above-referenced June 25th letter, we request that you clarify Cal-Am’s compliance with the requirement of Special Condition #11 that monitoring devices be installed at a minimum of four wells on the CEMEX site within 2000 feet of the test well.
A document copy of the letter is embedded. 
STATE OF CALIFORNIA—NATURAL RESOURCES AGENCY
CALIFORNIA COASTAL COMMISSION
LETTER FROM CHARLES F. LESTER, EXECUTIVE DIRECTOR, TO IAN CROOKS, P.E., ENGINEERING MANAGER, CALIFORNI A AMERICAN WATER COMPANY
July 3, 2015

REFERENCES: Cal Am must seek amended desal test well permit
By Jim Johnson, Monterey Herald
Posted: 07/06/15, 6:18 PM PDT |

CALIFORNIA AMERICAN WATER
TEST SLANT WELL DOCUMENTS

Sunday, July 06, 2014

City of Marina, Planning Commission Meeting: Item No: 6a. OPEN A PUBLIC HEARING, TAKE ANY TESTIMONY FROM THE PUBLIC, AND CONSIDER ADOPTING RESOLUTION NO. 2014- : (1) CERTIFYING A MITIGATED NEGATIVE DECLARATION AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, AND; (2) APPROVING COASTAL DEVELOPMENT PERMIT CDP 2012-05, FOR THE CALIFORNIA AMERICAN WATER SLANT TEST WELL PROJECT LOCATED AT CEMEX's LAPIS ROAD PROPERTY (APN's 203-011-001 & 203-011-019)

UPDATE:
Cal Am test wells rejected by Marina Planning Commission
Cal Am files appeal, expects to stay on schedule
By Jim Johnson, The Monterey County Herald
Highlight Excerpts:
"On Thursday, the commission voted against approval of a coastal development permit for Cal Am's test desal slant well program and the accompanying environmental review."
"The decision prompted Cal Am officials to file an appeal to the Marina City Council, which included a request for expedited review."

ABSTRACT:  The City of Marina, Planning Commission, is scheduled to conduct a Regular Meeting of the Planning Commission on Thursday, July 10, 2014 commencing at 6:30 P.M., Council Chambers, 211 Hillcrest Avenue, Marina, California. Agenda Item 6. PUBLIC HEARINGS a. Open a public hearing, take any testimony from the public, and consider adopting Resolution No. 2014- : (1) certifying a Mitigated Negative Declaration and adopting a Mitigation and Monitoring Program, and; (2) approving Coastal Development Permit CDP 2012-05, for the California American Water Slant Test Well Project located at CEMEX’s Lapis Road property (APN 203-011-001 & 203-011-019) is featured.  The SUMMARY of the Staff Report prepared by Theresa Szymanis, Planning Services Manager is reproduced. The AGENDA Packet is embedded. 

July 2, 2014
Honorable Chair and Members of the Marina Planning Commission
Planning Commission Meeting of July 10, 2014
Item No: 6a

REQUEST TO OPEN A PUBLIC HEARING, TAKE ANY TESTIMONY FROM THE PUBLIC, AND CONSIDER ADOPTING RESOLUTION NO. 2014- : (1) CERTIFYING A MITIGATED NEGATIVE DECLARATION AND ADOPTING A MITIGATION MONITORING AND REPORTING PLAN, AND; (2) APPROVING COASTAL DEVELOPMENT PERMIT CDP 2012-05, FOR THE CALIFORNIA AMERICAN WATER SLANT TEST WELL PROJECT LOCATED AT CEMEX's LAPIS ROAD PROPERTY (APN's 203-011-001 & 203-011-019)

SUMMARY

The first of the two requested actions is certification of the IS/MND and adoption of the MMRP. An MND can be adopted when the initial study has identified potentially significant effects on the environment, but: (1) revisions in the project plans would avoid or mitigate the effects to a point where clearly no significant effect on the environment would occur, and (2) there is no substantial evidence in light of the whole record before the public agency that the project, as revised, may have a significant effect on the environment.

Following action on the environmental document, the Planning Commission may, after review and consideration: approve, approve with conditions or deny the requested Coastal Development Permit. This decision is to be based on the analysis within this report and the ability to make the Findings within the draft Resolution and thus determine that the proposed project is consistent with the General Plan, the Local Coastal Land Use Plan, the Local Coastal Plan Implementation Plan and the Zoning Ordinance.
City of Marina
AGENDA Packet
Thursday, July 10, 2014 6:30 P.M.
REGULAR MEETING
PLANNING COMMISSION

ENVIRONMENTAL ASSESSMENT for the California American Water Slant Test Well Project, June 2014: Prepared For Lead Agency National Oceanic and Atmospheric Administration National Marine Sanctuary System Monterey Bay National Marine Sanctuary

ABSTRACT:  The ENVIRONMENTAL ASSESSMENT for the California American Water Slant Test Well Project, June 2014, has been made public by the lead agency, the National Oceanic and Atmospheric Administration National Marine Sanctuary System Monterey Bay National Marine Sanctuary. The document is embedded. The Summary and SECTION 1. INTRODUCTION 1.1 Project Background and History sections are reproduced.  Public Comment on the Draft Environmental Assessment of Potential Slant Test Well Project in the Monterey Bay National Marine Sanctuary through Saturday, July 26, 2014 via Electronic Submission or Mail: Bridget Hoover, Water Quality Protection Program Director, Monterey Bay National Marine Sanctuary, 99 Pacific Street, Building 455A, Monterey, CA 93940

ENVIRONMENTAL ASSESSMENT for the California American Water Slant Test Well Project
June 2014

Summary
Monterey Bay National Marine Sanctuary (MBNMS) proposes to authorize a short-term well pumping program proposed by California American Water (Cal Am or the Project Applicant). The Proposed Action is located in the MBNMS and adjacent on-shore areas within the City of Marina, Monterey County, California. The project requires MBNMS authorizations for activities prohibited in MBNMS by Subpart M of the National Marine Sanctuary Program regulations, including (1) a discharge of pumped, untreated groundwater into MBNMS, and (2) drilling into and disturbance of submerged lands within MBNMS.

Cal Am would construct a slant test well in the coastal foredunes and conduct a 24-month pumping and testing program to obtain information regarding the geologic, hydrogeologic and water quality characteristics of the underlying aquifers in the project area. The data obtained over the 24-month test period would be used to facilitate the planning and final design of a proposed subsurface intake system and desalination plant to serve as the primary future water supply source for the Monterey Peninsula. The Proposed Action includes a discharge of untreated pumped water into waters of MBNMS via an existing wastewater ocean outfall pipe extending approximately 2 miles offshore. The potential environmental impacts of the Proposed Action are discussed and analyzed in this Environmental Assessment (EA).

This EA was prepared in accordance with the National Environmental Policy Act of 1969 (42 United States Code §4321 et seq.), as implemented by the Council on Environmental Quality Regulations (40 Code of Federal Regulations §1500-1508); and National Oceanic and Atmospheric Administration Administrative Order 216-6, Environmental Review Procedures for Implementing the National Environmental Policy Act, of May 20, 1999.

SECTION 1. INTRODUCTION

1.1  Project Background and History

California American Water (Cal Am), the project applicant, proposes development of a slant test well, which would extend diagonally under the floor of the Pacific Ocean and into submerged lands of Monterey Bay National Marine Sanctuary (MBNMS) through the Dune Sand Aquifer, Salinas Valley Aquitard (if present in the project area), and 180-Foot Aquifer or its equivalent unit at this location (referred to herein as the 180-FTE). The slant test well is proposed for information gathering purposes. It would operate as a test facility for a temporary period (maximum 24-month pumping period) to provide field data concerning the geologic, hydrogeologic, and water quality characteristics of the project site. The overall project, including construction and decommissioning activities, is expected to take no longer than 3 years.

MBNMS is serving as National Environmental Policy Act (NEPA) Lead Agency for issuance of required authorizations to allow discharge into MBNMS waters and drilling into and disturbance of submerged lands in MBNMS. The City of Marina is serving as California Environmental Quality Act (CEQA) Lead Agency for issuance of the primary local permits and CEQA environmental clearances. Multiple other local, state, and federal agencies are acting as Cooperating Agencies under NEPA and/or Responsible Agencies under CEQA, due to their discretionary approval authority over some component of the Proposed Action. Cooperating or Responsible Agencies include the U.S. Fish and Wildlife Service (USFWS), NOAA’s National Marine Fisheries Service (NOAA Fisheries), California Coastal Commission (CCC), California State Lands Commission, Central Coast Regional Water Quality Control Board (CCRWQCB), Monterey Bay Unified Air Pollution Control District (MBUAPCD), Monterey County Department of Environmental Health, and Monterey Regional Water Pollution Control Agency (MRWPCA).

The data obtained through operation of the Proposed Action would be used in the design and planning of a potential subsurface intake system and desalination plant that has been proposed to serve as the primary future water supply source for the Monterey Peninsula known as the Monterey Peninsula Water Supply Project (MPWSP). The MPWSP would include a full-scale subsurface intake system (if determined to be feasible through the results yielded by the temporary slant test well) and is subject to separate environmental review and regulatory permitting processes that are currently ongoing. The NEPA Lead Agency for the MPWSP is currently being determined. The CEQA Lead Agency for the MPWSP is the California Public Utilities Commission (CPUC).

To facilitate the environmental planning and design of the MPWSP, a Hydrogeologic Working Group (HWG) has been established to develop a workplan of on-going steps of data collection and analysis necessary for refinement of the North Marina Ground Water Model, which is the tool being developed to evaluate the short- and long-term hydrogeologic impacts from operation of the MPWSP. The HWG is comprised of a team of hydrogeologic experts representing the interests of various stakeholders of groundwater use and management in the region, including:

§ Cal Am – a privately-owned water and wastewater company and the project applicant for the slant test well and MPWSP;
§ CPUC – the CEQA lead agency for the full-scale MPWSP;
§ CEMEX, Inc. – the property owner of the proposed location of the slant test well and MPWSP;
§ Salinas Valley Water Coalition – a non-profit public benefit corporation that was organized in 1991 to promote the fair representation and evaluation of water issues in Monterey County. The Salinas Valley Water Coalition collaborates with and supports the Monterey County Water Resources Agency (MCWRA) in its pursuit of long-term balance of supply and demand of water in the Salinas Valley Groundwater Basin and its effort to halt seawater intrusion; and the
§ Monterey County Farm Bureau – a private, non-profit association of farmers and ranchers throughout Monterey County that collaborates with other agricultural organizations to advocate for the agricultural community and environment.

The slant test well project has been identified as a critical step of data collection in the HWG workplan.

It is possible that, if the MPWSP is successfully developed, Cal Am will request that the slant test well be converted into a permanent facility and connected to the future subsurface intake system and desalination plant as one of several permanent subsurface intake wells. The potential environmental effects associated with construction, conversion and permanent operation of the slant test well and all other proposed permanent subsurface intake wells is currently being reviewed in the separate NEPA and CEQA process being completed for the full-scale MPWSP and an Environmental Impact Statement and Environmental Impact Report are being or will be prepared. Due to uncertainty over whether the MPWSP will be approved and constructed as proposed, long-term operation of the slant test well has not been proposed by Cal Am at this time. Because no long-term operations are proposed and development and permanent operation of the test well is already being reviewed in the separate NEPA/CEQA process, no long-term operations are considered in this document. Permanent operation of the slant test well would not be permitted under the project approvals and permits currently being sought.

While the slant test well’s relation to the larger project is recognized, the slant test well’s present data gathering purpose is independent of the full-scale MPWSP. The slant test well pumping program would provide a better understanding of the potential effects of the full-scale system and allow better informed agency coordination and public review of the MPWSP. The slant test well, even as a separate temporary project, requires authorizations from MBNMS for the proposed discharge and disturbance of submerged lands, and a coastal development permit from the City of Marina and CCC, which triggers NEPA/CEQA review. Therefore, this Environmental Assessment (EA) analyzes the development of the slant test well, temporary test pumping for up to 24 months, and decommissioning of the slant test well and related appurtenant infrastructure at the end of the test period.

REFERENCES:
MONTEREY BAY NATIONAL MARINE SANCTUARY
Request for Public Comment for Draft EA of Potential Slant Test Well Project in MBNMS (COMMENTs DUE BY 7/26/14)
MBNMS has developed a draft environmental assessment (EA) to analyze the potential impacts of a slant test well project proposed by California American Water, a privately-owned water and wastewater company, which may have the potential to affect environmental resources within MBNMS and adjacent shoreline areas. The proposed project described in the EA has been evaluated for consistency with the National Marine Sanctuaries Act, sanctuary goals and objectives, and ONMS and MBNMS permitting regulations. For more information, please contact Bridget Hoover by email. (6/26/14)
Click to post your comments (Click on "Comment Now!" icon)

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

National Oceanic & Atmospheric Administration
NATIONAL MARINE SANCTUARIES

Saturday, May 31, 2014

Draft Initial Study and Mitigated Negative Declaration For the California American Water Slant Test Well Project & Appendices A-E (May 2014)

ABSTRACT: The “Draft Initial Study and Mitigated Negative Declaration For the California American Water Slant Test Well Project” and Appendices A-E, May 2014, prepared for the City of Marina and prepared by SWCA Environmental Consultants documents are embedded. “The City of Marina oversaw preparation of an Initial Study (IS) for the project in October 2013 (SWCA 2013). The IS indicated that the proposed project had the potential to result in significant adverse effects on the environment, but that any such effects could be avoided or reduced to a less than significant level through project design modifications and development and implementation of feasible mitigation. Pursuant to the terms of a 1986 Settlement Agreement between the City of Marina and the Sierra Club, the IS was provided to the Ventana Chapter of the Sierra Club for their review and recommendation as to the appropriate environmental document required for environmental compliance under CEQA. On November 1, 2014, the California Environmental Law Project (attorney for the Ventana Chapter of the Sierra Club) responded by stating, “…the Sierra Club has no objection to the City preparing a mitigated negative declaration in connection with California American Water’s application for a test well in connection with its proposed desal[ination] facility.”
“Based on the analysis provided in the IS, the findings of additional environmental analysis conducted and technical studies prepared in response to early agency consultation, and concurrence from the Sierra Club per the requirements of the 1986 Settlement Agreement, the City of Marina has prepared a Draft Initial Study and Mitigated Negative Declaration (IS/MND) for the Cal Am Slant Test Well Project for public circulation and review. The Draft IS/MND will be circulated for public review during a 30-day public comment period pursuant to CEQA Guidelines Section 15105. Prior to approving a proposed project, the City must consider the draft environmental documentation, together with any public comments received during the public review period.”
Moreover, according to reporting in The Monterey County Herald, “The study assessed the potential impact of a test slant well and four monitoring wells on the Cemex site in north Marina where desal plant source water would be pumped from beneath the ocean floor. The test wells are designed to operate for up to two years and gather technical data on the potential hydrogeologic and water quality effects of the proposed pumping for the desal plant. The data would not, however, be included in the project's environmental impact report, which is due to be released early next year.” Additionally, “The city's planning commission is scheduled to consider the permit application on July 10, and an expected state Coastal Commission review could occur by October, theoretically allowing the test wells to be drilled the following month."  Importantly, “The test wells are separate from a series of bore holes used to collect information for a hydrogeological working group, whose findings will be used to determine the suitability of the proposed Cemex desal plant source water intake site.”
RELATED NEWS ARTICLE:
Monterey desal: Environmental study released on proposed slant wells
By Jim Johnson, The Monterey County Herald, 05/31/2014

Draft Initial Study and Mitigated Negative Declaration
Draft Initial Study and Mitigated Negative Declaration For the California American Water Slant Test Well Project
May 2014
Prepared For: City of Marina
Prepared By: SWCA Environmental Consultants
APPENDICES A-E
APPENDIX A: SIERRA CLUB RESPONSE LETTER
APPENDIX B: BIOLOGICAL RESOURCES BACKGROUND INFORMATION
APPENDIX C: CULTURAL RESOURCES BACKGROUND INFORMATION
APPENDIX D: GEOLOGY AND SOILS BACKGROUND INFORMATION
APPENDIX E: HYDROLOGY AND WATER QUALITY BACKGROUND INFORMATION

NOTE: The review period for the Initial Study/Mitigated Negative Declaration begins May 19, 2014 through June 17, 2014.