Thursday, July 09, 2015

THE PEOPLE’S MOSS LANDING WATER DESAL PROJECT (PMLWDP) : MOSS LANDING HARBOR DISTRICT NOTICE OF PREPARATION Environmental Impact Report for People’s Moss Landing Water Desalination Project

ABSTRACT: Regarding the Environmental Impact Report for People’s Moss Landing Water Desalination Project, per California Environmental Quality Act (CEQA) , the Moss Landing Harbor District (District), as CEQA Lead Agency, is preparing an Environmental Impact Report (EIR) for the People’s Moss Landing Water Desalination Project (PMLWDP or Proposed Project). Accordingly, two Scoping Meetings were held on Wednesday, July 8, 2015 in Del Rey Oaks and Prunedale on the scope of the EIR. The scoping meetings presented an overview of the Proposed Project and the project alternatives identified to date. Subsequent to the presentation, interested parties were given the opportunity to make oral comments on issues to be considered in the EIR, or on Notice of Preparation People’s Moss Landing Desalination Project 2.
Written scoping comments may be submitted by U.S. mail or email during the NOP review period, or in person at the scoping meetings listed below. The scoping comment period closes at 5:00 p.m. on July 31, 2015. Please include your name, address, and email address if you would like to receive future notices on this matter. Comments may be sent by email to PeoplesDesal@aspeneg.com or to the address below:
Linda G. McIntyre, Moss Landing Harbor District
c/o Aspen Environmental Group
235 Montgomery Street, Suite 935
San Francisco, CA 94104

THE PEOPLE’S MOSS LANDING WATER DESAL PROJECT

NOTICE OF PREPARATION
Environmental Impact Report for People’s Moss Landing Water Desalination Project


The People’s Moss Landing
Water Desal Project
Draft Process Design Report
February 27, 2015
Prepared by:
604 South Frederick Avenue, Suite 309
Gaithersburg, Maryland 20877


MOSS LANDING HARBOR DISTRICT
REQUEST FOR PROPOSALS
CONSULTANT SERVICES FOR ENVIRONMENTAL IMPACT REPORT REVIEW, CEQA PROCESSING SERVICES, FOR THE PEOPLE’S MOSS LANDING WATER DESALINATION PROJECT
February 6, 2015

REFERENCE:
People’s Desal Project starts formal environmental review
By Jim Johnson, Monterey Herald
Posted: 07/08/15

Saturday, February 23, 2013

‘Monterey Peninsula desal project has two backup options:’ Central Coast Regional Water Project (DeepWater Desal's proposal) & People's Moss Landing Desal Project

ABSTRACT: Excerpts Highlights of The Monterey County Herald’s news article entitled “Monterey Peninsula desal project has two backup options In case Cal Am project fails” by Herald Staff Writer Jim Johnson are presented; a link to the complete news article is provided.

In case Cal Am project fails
By JIM JOHNSON Herald Staff Writer, 02/22/2013

Excerpts Highlights:
DeepWater Desal and the People's Moss Landing Desal Project will compete for the Monterey Peninsula Water Management District's support as a contingency project.

DeepWater Desal's proposal, dubbed the Central Coast Regional Water Project, calls for creating a public-private partnership charged with paying for, and eventually owning and operating, a desal plant capable of delivering 10,000 acre-feet per year of potable water for the Peninsula. The partnership would include a single public agency or a new joint powers authority of public agencies.

The People's Project proposal calls for Moss Landing Commercial Park LLC to design and build a $75.5 million desal plant on about 25 acres at the 200-acre business park site. It would rely on existing infrastructure, including pipelines and easements.
According to the plan, the desal plant would be capable of producing up to 11,200 acre-feet of potable water a year.
The plan would require the water management district to purchase the desal plant site for $25 million or sign a 50-year lease with a 49-year option including terms to be negotiated. The project developer would promise to consider deferring acquisition costs until bonds are sold to finance the project.

Friday, December 21, 2012

Regional Desalinization Project at Moss Landing Commercial Park (formerly The People's Moss Landing Desal Project) Announced by Don Lew of Concord-based JDL Development LLC at Pacific Grove City Council Meeting, 19 December 2012

ABSTRACT: At the City of Pacific Grove City Council Meeting on Wednesday, 19 December 2012, Don Lew of Concord-based JDL Development LLC announced he had taken over the formerly known the People's Moss Landing Desal Project, now named the Regional Desalinization Project at Moss Landing Commercial Park. The CITY OF PACIFIC GROVE CITY COUNCIL REGULAR MEETING AGENDA Wednesday, December 19, 2012 and Water Update AGENDA REPORT documents are embedded. RELATED NEWS ARTICLES, with links, are provided.
CITY OF PACIFIC GROVE
CITY COUNCIL
Wednesday, December 19, 2012
Water Update

RELATED NEWS ARTICLES:
Nader Agha hands over control of Moss Landing desal proposal
Equity firm owner takes control in Moss Landing
By JIM JOHNSON Herald Staff Writer, 12/20/2012
EXCERPT HIGHLIGHTS
At late Wednesday's Pacific Grove City Council meeting, Don Lew of Concord-based JDL Development LLC announced he had taken over the project — formerly known as the People's Moss Landing Desal Project, now named the Regional Desalinization Project at Moss Landing Commercial Park — and that Agha was no longer involved. Sources said Lew told the council he was assembling an expert team to back the proposal, though he didn't offer many specifics.
Lew, who was accompanied by former Pacific Grove mayor and current WaterPlus Executive Director Carmelita Garcia, made the announcement during an update on three local desal projects: the former People's Project; a proposal from California American Water working its way through the Public Utilities Commission; and a proposal from DeepWater Desal.

December 20, 2012
EXCERPT HIGHLIGHT
He (Lew) stressed that the change will not affect the city of P.G.’s relationship with Agha’s desal proposal. In July the city signed on to a preliminary agreement with Agha, positioning P.G. as the potential lead agency in the People’s Project.
But Lew told the council the project will instead by evaluated as a part of Cal Am’s Water Supply Project environmental impact report—prompting council members to ask whether the agreement is still valid.

Wednesday, December 19, 2012

Evaluation of Seawater Desalination Projects FINAL REPORT, Separation Processes, Inc. & Kris Helm Consulting for the Monterey Peninsula Regional Water Authority

RELATED NEWS ARTICLES:
Cal Am desal project most expensive option, report says
Water authority: Finding based on higher interest rate
By JIM JOHNSON Herald Staff Writer, 12/19/2012
EXCERPT HIGHLIGHT
...the report found that Cal Am's project would cost about $3,300 per acre-foot per year, while competing proposals from DeepWater Desal and the People's Moss Landing Project would cost about $2,205 and $2,320, respectively

Salinas makes deal with desal firm
By JIM JOHNSON Herald Staff Writer, 12/19/2012 
EXCERPT HIGHLIGHTS
...the Monterey Peninsula Regional Water Authority's consultant Separation Processes, Inc., released a final report on Tuesday on its comparison study of three desal plant proposals from California American Water, DeepWater Desal, and the People's Moss Landing Desal Project.

ABSTRACT: Evaluation of Seawater Desalination Projects FINAL REPORT, prepared by Separation Processes, Inc. and Kris Helm Consulting for the Monterey Peninsula Regional Water Authority, is embedded.

Saturday, November 10, 2012

DESALINATION INFORMATION: ‘Seawater Desalination Costs,’ ‘An Investigation of the Marginal Cost of Seawater Desalination in California,’ ‘Desalination: A National Perspective,’ Desalination Myths and Misconceptions & Desalination for a Better World

ABSTRACT: Desalination papers, including “Seawater Desalination Costs White Paper,” September 2011; Revised January 2012, WATERREUSE ASSOCIATION (link), “An Investigation of the Marginal Cost of Seawater Desalination in California” by James Fryer, Environmental Scientist, March 18, 2010 (embedded) and "Desalination: A National Perspective" (embedded), are presented. “An Investigation of the Marginal Cost of Seawater Desalination in California” Executive Summary states: Seawater desalination for $800 to $1,000 per acre-foot? Some advocates of seawater desalination suggest marginal costs of $800 to $1,000 per acre-foot are now possible in California. However, despite a thorough investigation, this study found no evidence of seawater desalination facilities in North America producing water in that cost range. This study also found no credible evidence that new seawater desalination projects in California, given local conditions, could produce water in that cost range.  Given the best presently available technology, this investigation found realistic estimates of the marginal costs for seawater desalination in California will range from a minimum of about $2,000 to $3,000 or more per acre-foot of water produced.  International Desalination Association videos "Desalination Myths and Misconceptions" and  "Desalination for a Better World" are embedded.

Seawater Desalination Costs White Paper
September 2011; Revised January 2012
WATERREUSE ASSOCIATION

An Investigation of the Marginal Cost of Seawater Desalination in California 
by James Fryer, Environmental Scientist
March 18, 2010

Responsible vs. Irresponsible Desalination Chart

Desalination: A National Perspective 
Committee on Advancing Desalination Technology, National Research Council

Desalination Myths and Misconceptions


 International Desalination Association - Desalination for a Better World

Saturday, October 13, 2012

WaterPlus: ‘THE ONLY LOCAL ORGANIZATION LOOKING OUT FOR YOU, THE RATEPAYER’ Presents Leadership in Action Water Forum on the new Pacific Grove Desalination Project

ABSTRACT: WaterPlus, a public benefit nonprofit corporation, is “THE ONLY LOCAL ORGANIZATION LOOKING OUT FOR YOU, THE RATEPAYER.” THE NEW WATERPLUS MISSION STATEMENT: “Since the collapse of the regional desalination project, in which WaterPlus advocated for community control by promoting the municipalization of Cal Am, WaterPlus has expanded its mission as follows: To advocate in behalf of local Cal Am ratepayers for an adequate and affordable water supply by all reasonable means, including (its original mission) the persuasion or creation of a public agency to purchase Cal Am.” And IMPLEMENTATION: “To implement this new mission, WaterPlus is promoting the development of a desalination plant that will be sufficiently large to constitute a drought-proof water supply for the Monterey Peninsula, at the least possible cost to local ratepayers.” The WaterPlus Forum video(s) on the Pacific Grove Desalination Project, July 16, 2012, including Segments #1 - #6 and the entire 1:20:51 WATER PLUS FORUM ON THE PACIFIC GROVE DESALINATION PROJECT, are embedded.


Richard Stillwell and Ron Weitzman, President, WaterPlus Monterey
Segment #1 of the July 16, 2012 WaterPlus Forum

Daniel Miller, Pacific Grove Councilmember, Water Committee
Segment #2 of the July 16, 2012 WaterPlus Forum

Rudy Fischer, Pacific Grove Councilmember, Water Committee
Segment #3 of the July 16, 2012 WaterPlus Forum

Cameron Weist, Attorney at Law, Specializing in Public Financing
Segment #4 of the July 16, 2012 WaterPlus Forum

Paul Hart, Attorney at Law
Segment #5 of the July 16, 2012 WaterlPlus Forum

Robert Barminski, Hydrologist, Environmental Scientist
Mike Mickley, P.E., Ph.D, Science and Engineering Consultant
Segment #6 of the July 16, 2012 WaterPlus Forum

WATER PLUS FORUM ON THE PACIFIC GROVE DESALINATION PROJECT
July 16, 2012 (Segments #1 - #6)

Saturday, September 29, 2012

CITY OF PACIFIC GROVE CITY COUNCIL SPECIAL MEETING 29 September 2012: Proposal to Cal Am for Public Entity Participation in Desalination Project

ABSTRACT: Today, 29 September 2012, the City of Pacific Grove City Council met for a Special Meeting at 9:00 A.M. regarding URGENT UNFINISHED BUSINESS A. October 1, 2012 Filings with Cal Am and the California Public Utilities Commission (CPUC). Recommended Action: 1. Review and approve the City’s draft filings to Cal-Am for October 1, 2012: one as the public agency for the People’s Desal Project, and a second in relation to small water projects within Pacific Grove that would allow us to end the use of potable water on the golf course and cemetery; and 2. Approve resolutions authorizing the Mayor to submit each filing to Cal-Am in response to the request by Administrative Law Judge Gary Weatherford on behalf of the California Public Utilities Commission. The Conclusion of the 29 September 2012 letter to Rob MacLean, President, California American Water Company RE: Proposal to Cal Am for Public Entity Participation in Desalination Project states, as follows:
The City of Pacific Grove requests that Cal-Am enter into a public/private partnership agreement with regard to the People’s Desalination Project.
The City of Pacific Grove requests that Cal-Am assist and co-operate in submitting an  application to CPUC to have the People’s Project evaluated simultaneously with Cal-Am’s current application to the CPUC, with the People’s Project being considered as an alternative to the currently proposed Marina Desalination Project.
Finally, the City of Pacific Grove requests a prompt meeting with authorized representatives of Cal-Am to discuss this proposal, in an attempt to determine whether an agreement can be reached and formalized prior to Cal-Am’s October 26, 2012 deadline for filing its compliance progress report to ALJ Weatherford. 

The 29 September 2012 letter, THE PEOPLE’S MOSS LANDING WATER DESAL PROJECT document dated September 2012 and Attachment A: SPI MEMORANDUM are embedded.

URGENT UNFINISHED BUSINESS
October 1, 2012 Filings with Cal Am and the California Public Utilities Commission (CPUC).

Wednesday, September 19, 2012

CITY OF PACIFIC GROVE CITY COUNCIL: Agreement for the Development of Small Water Projects Independent of Efforts with Moss Landing Commercial Ventures to Develop a Proposal for the Peoples Desal Project & Water Authority to Develop a Cal-Am Project Governance Proposal

ABSTRACT: Today, Wednesday, September 19, 2012, the City of Pacific Grove City Council is scheduled to consider 15. NEW BUSINESS B. Agreement for the Development of Small Water Projects. City Manager Thomas Frutchey’s RECOMMENDATION: Approve a resolution authorizing the City Manager to enter into an agreement with James Brezack and Associates for the development of one or more small water project proposals in response to the request by Administrative Law Judge Gary Weatherford on behalf of the California Public Utilities Commission. Under DISCUSSION, it is noteworthy that “This effort is entirely independent of our joint effort with Moss Landing Commercial Ventures to develop a proposal for the Peoples Desal Project, as well as our joint effort with the other cities in the Water Authority to develop a Cal-Am project governance proposal, both of which we will also be submitting to Cal-Am by October 1.” The relevant section of the AGENDA is reproduced; the AGENDA REPORT, including ATTACHMENTS (Selected pages from Judge Weatherford’s Directives and Ruling on 8/29/12, Resolution and Proposed Agreement), is embedded.

NOTICE OF MEETING 
CITY OF PACIFIC GROVE 
CITY COUNCIL 
Wednesday, September 19, 2012 
Special Meeting Begins at 5:00 P.M. Regular Meeting Begins at 6:00 P.M. 
Council Chambers – City Hall – 300 Forest Avenue, Pacific Grove, CA 

REGULAR MEETING AGENDA 
6:00 p.m.
CALL TO ORDER


REGULAR AGENDA

15. NEW BUSINESS


B. Agreement for the Development of Small Water Projects
Reference: Thomas Frutchey, City Manager
Recommended Action: Approve a resolution authorizing the City Manager to enter into an agreement with James Brezack and Associates for the development of one or more small water project proposals in response to the request by Administrative Law Judge Gary Weatherford on behalf of the California Public Utilities Commission.
AGENDA REPORT
SUBJECT: Agreement for the Development of Small Water Projects

ADDENDUM:

DRAFT ACTION MINUTES 
CITY OF PACIFIC GROVE 
CITY COUNCIL 
SPECIAL AND REGULAR MEETING AGENDAS 
Wednesday, July 18, 2012 
Council Chambers – City Hall – 300 Forest Avenue, Pacific Grove, CA

REGULAR MEETING AGENDA

The City Council convened the regular meeting at 6:00 p.m.

CALL TO ORDER
Mayor Garcia, Councilmembers Kampe, Cohen, Cuneo, Fischer, Huitt, and Miller in attendance.

14. UNFINISHED BUSINESS

D. Agreement initiating a relationship with Nader Agha and Moss Landing Commercial Park, LLC (LMCP) to develop a desalinated water project able to meet the needs of Pacific Grove and the Monterey Peninsula

Councilmember(s) Huitt announced his ex-parte communications with the proponent.

The following audience members spoke on the proposal: Support: Pau. Hart, Mr. Agha’s representative on behalf of proponent; Michelle Jackson; Richard Stillwell; Bill Hood; Ron Wiseman, Water Plus; Harvey Billick, Water Plus. Oppose: Phillip Morgan; Nelson Vega; Steve Gorman; Ida Barber; Robin Tokmakian; Donald Murphy; Sue McCloud.

Upon motion by Councilmember Fischer and second by Councilmember Miller, the City Council voted to approve the Formation Agreement with Nader Agha/Moss Landing Commercial Park, LLC and the City of Pacific Grove.
AYES: Mayor Garcia, Councilmembers Cohen, Cuneo, Fischer, and Miller. 
NOES: Councilmembers Huitt and Kampe

E. Consideration of the City’s Continued Membership in the Monterey Peninsula Regional Water Authority

The following audience members spoke regarding continued membership:
Support: Sue McCloud, former Carmel Mayor; Del Rey Oaks Mayor Edelen.
Oppose: Ron Wiseman, Water Plus; Nelson Vega.

Upon motion by Councilmember Fisher and second by Councilmember Miller, the City Council voted unanimously to continue membership in the Water JPA.

Sunday, June 24, 2012

CITY OF PACIFIC GROVE CITY COUNCIL: STATUS REPORT by Paul Hart, Esq., Counsel for Nader Agha and Moss Landing Commercial Park, LLC (MLCP) RE: Formation Agreement Between City and MLCP

ABSTRACT: STATUS REPORT by Paul Hart, Esq., Counsel for Nader Agha and Moss Landing Commercial Park, LLC (MLCP) RE: Formation Agreement Between City and MLCP is embedded. Importantly, the STATUS REPORT responds to the City Manager’s Arguments Against Entering Formation Agreement and states, as follows:
The City Manager's Agenda Report presents seven arguments against entering the Formation Agreement. Unfortunately, each of the arguments are flawed, for one or more of the following reasons:
1. The arguments are outside the proper scope of this meeting. The Council has already approved the agreement, subject only to the Indemnification Provision language of paragraph 15.
2. The arguments attempt to re-hash arguments that have already been considered and rejected by The Council.
3. The arguments are based upon inaccurate facts;
4. The arguments are legally and procedurally inaccurate;
5. The arguments improperly present "Opinions" as facts;
Mr. Hart concludes: “For all the reasons cited previously by The Council, the pursuit of publically controlled water for the Citizens of Pacific Grove and avoiding the exorbitantly high cost of water from the Cal Am project is in the best interest of the City. Moreover, the City can take this next step without risk of any kind and without any out-of-pocket cost.”

A PROFESSIONAL CORPORATION
STATUS REPORT
DATE: June 20, 2012
TO: Honorable Mayor and Members of the City Council
FROM: Paul Hart, Esq., Counsel for Nader Agha and Moss Landing Commercial Park, LLC (MLCP)
MEETING DATE: June 20, 2012
RE: Formation Agreement Between City and MLCP

Tuesday, June 19, 2012

Monterey Peninsula Regional Water Authority Request for Proposals: Comparison of Cost Estimates for the Desalination Projects and Evaluation of Schedule and Alternative Financing Options


ABSTRACT: The Monterey Peninsula Regional Water Authority Request for Proposals: Comparison of Cost Estimates for the Desalination Projects and Evaluation of Schedule and Alternative Financing Options is embedded.  Proposals are due to the Authority in the City of Pacific Grove’s Offices by 5:00 P.M. on July 6, 2012.  The Contractor will be retained to provide an independent, unbiased, third-party assessment of the three proposed desalination projects, namely California American Water Company's Monterey Peninsula Water Supply Project, DeepWater Desal, LLC and Peoples’ Moss Landing Desal.  There are six specific items as to project scope, including Initial Scoping and Constraints Analysis, Comparison of Cost Estimates for the Three Desalination Projects, Identify and Isolate Project Differences, Evaluation of Schedule, Evaluation of Financing Options and Workshop/Presentation.  Importantly, the selection of CONTRACTOR and subsequent contract award will be based on criteria including, but not limited to, the following:
· Qualifications and experience;
· Understanding of project goals;
· Proposed methodology to fulfill the intent of this RFP;
· Ability and capacity to fulfill the intent of this RFP;
· Reasonable budget, work schedule, and timeline.


Sunday, June 17, 2012

CITY OF PACIFIC GROVE CITY COUNCIL 20 June 2012 Meeting Agenda Item: UNFINISHED BUSINESS Agreement initiating a relationship with Nader Agha and Moss Landing Commercial Park, LLC (MLCP) to develop a desalinated water project able to meet the needs of Pacific Grove and the Monterey Peninsula

Corrections
The Monterey County Herald, 06/25/2012
The continuation of consideration of an agreement between the city of Pacific Grove and water-project developer Nader Agha wasn't the subject of a hearing or council vote last week as reported in a Saturday story in The Herald. The item was pulled off the council's Wednesday agenda by Mayor Carmelita Garcia and delayed until July 18.

UPDATE & RELATED NEWS ARTICLE:
But city manager says risks outweigh benefits, LARRY PARSONS, Herald Staff Writer, 06/22/2012

Despite a highly critical report by City Manager Thomas Frutchey that concluded that the risks outweigh the potential benefits, the council voted 5-2 this week to keep the proposed preliminary partnership alive - on yet-unsigned paper.
"The matter has been continued to July 18,"...

An attorney for Agha also took issue with the negative recommendation by Frutchey.
"Unfortunately each of (his) arguments is flawed," said attorney Paul Hart in a 10-page memo countering Frutchey's seven-page analysis.

ABSTRACT: The City of Pacific Grove City Council is scheduled to hold a regular meeting on Wednesday, June 20, 2012 at 6:00 P.M. in Council Chambers, City Hall, 300 Forest Avenue to consider Consent Agenda Item No. 14A UNFINISHED BUSINESS Agreement initiating a relationship with Nader Agha and Moss Landing Commercial Park, LLC. (MLCP) to develop a desalinated water project able to meet the needs of Pacific Grove and the Monterey Peninsula. The AGENDA REPORT, prepared by Thomas Frutchey, City Manager, includes a RECOMMENDATION:
1.  Receive an update on the agreement to initiate and provide funding to establish a public/private partner relationship between Nader Agha/Moss Landing Commercial Park, LLC and the City of Pacific Grove.
2.  Decline taking action on the agreement at this time.  (If Council disagrees, it has the ability to take one or more alternative actions, including approving the agreement.)
CONCLUSION: “I cannot recommend that the City become a partner in this project; the downside risks far outweigh the possible benefits that cannot be achieved by other means.  It is my professional opinion that the City’s goals can be better achieved and our citizens better served by not proceeding with this agreement at this time, but instead, continuing as a full participating partner in the Water JPA.”
Selected excerpts from the AGENDA REPORT are presented and the AGENDA REPORT, including City Manager Thomas Frutchey's Report, FORMATION AGREEMENT BETWEEN THE CITY OF PACIFIC GROVE AND MOSS LANDING COMMERCIAL PARK, LLC. (June 1, 2012), George Schroeder's and Nader Agha's Letter to Monterey Mayor Chuck Della Sala Re: Technical Advisory Committee of the Water Authority (June 5, 2012) and Nader Agha's Monterey County Herald Letter to the Editor (June 12, 2012), City of Pacific Grove Prehearing Conference Statement, Public Utilities Commission (June 4, 2012) and Schedule Proposed by California Public Utilities Commission (CPUC) Administrative Law Judge (ALJ) in Pre-Hearing Conference (PHC) (JUne 6, 2012), is embedded.  Parenthetically, Schroeder and Agha state in their letter to Monterey Mayor Della Sala that "we decided that we would withdraw our proposal from the consideration of the TAC, and did tell them that at the June 4th meeting, and further told them that we would work only directly with the Water Authority or other committee it has.  We request that our proposal be examined by the Water Authority along with Deepwater in the further detailed analysis the Water Authority is planning to undertake."



6:00 p.m.
CALL TO ORDER

14 UNFINISHED BUSINESS

  1. Agreement initiating a relationship with Nader Agha and Moss Landing Commercial Park, LLC. (MLCP) to develop a desalinated water project able to meet the needs of Pacific Grove and the Monterey Peninsula  PG 273
Reference:  Thomas Frutchey, City Manager

1.  Receive an update on the agreement to initiate and provide funding to establish a public/private partner relationship between Nader Agha/Moss Landing Commercial Park, LLC and the City of Pacific Grove.
2.  Decline taking action on the agreement at this time.  (If Council disagrees, it has the ability to take one or more alternative actions, including approving the agreement.)

 RECOMMENDATION of Thomas Frutchey, City Manager:
1.  Receive an update on the agreement to initiate and provide funding to establish a public/private partner relationship between Nader Agha/Moss Landing Commercial Park, LLC and the City of Pacific Grove.
2.  Decline taking action on the agreement at this time.  (If Council disagrees, it has the ability to take one or more alternative actions, including approving the agreement.)

Importantly, in City Manager Thomas Frutchey’s AGENDA REPORT, he states:
Peering into the future is always uncertain, but the City’s involvement in the People’s Project would appear to have a low likelihood of positive benefit, and a high risk that the costs would exceed the benefits, for the following seven reasons:
1. The CPUC and other regulatory agencies are not likely to approve Mr. Agha’s project (or either of the other two projects) as currently conceived.
2. Cal-Am’s application before the CPUC does not to provide a proper means by which CalAm will be authorized to buy water from the People’s Project to convey to ratepayers.
3. Mr. Agha and the City have markedly different goals, and the proposed partnership is ill suited to assist either party in reaching its goals.
4. Given that a public partner does not appear necessary, the City has nothing of value to offer Mr. Agha, but does impose significant restrictions on his freedom to act.
5. This project is way beyond the City’s capabilities, and would impose unacceptable opportunity costs on the other responsibilities and opportunities we have in the coming years.
6. There are significant financial and legal risks of the City’s involvement in this project.
7. The resources Mr. Agha is willing and able to commit are not likely to be sufficient to see this project through to completion.  Thus, Mr. Agha will likely need at least one other partner, which will complicate an already challenged relationship even further.

CONCLUSION
The Council subcommittee has consistently championed this project and the partnership.  As City Manager, however, my perspective, and the factors that I must consider, are inherently different...

...However, as City Manager, I cannot recommend that the City become a partner in this project; the downside risks far outweigh the possible benefits that cannot be achieved by other means.  It is my professional opinion that the City’s goals can be better achieved and our citizens better served by not proceeding with this agreement at this time, but instead, continuing as a full participating partner in the Water JPA.

Consent Agenda Item No. 14A
CITY OF PACIFIC GROVE
300 Forest Avenue, Pacific Grove, California 93950

Tuesday, May 22, 2012

CITY OF PACIFIC GROVE CITY COUNCIL 23 MAY 2012 MEETING AGENDA ITEM: Agreement initiating a relationship with Nader Agha to develop a water project able to meet the needs of Pacific Grove and the Monterey Peninsula

RELATED NEWS ARTICLE: Agha, P.G. at odds over who will pay to defend lawsuits, KELLY NIX, The Carmel Pine Cone, June 1, 2012, 1A & 22A
“He (Councilman Dan Miller) pointed to Agha’s agreement to purchase a $2 million insurance policy that would protect the city from litigation in the event of Agha or his company, Moss Landin Commercial Park, were negligent.”
“Miller told The Pine Cone Wednesday the item will likely be on next week’s city council agenda and that he expects the indemnification issue to be resolved.”

UPDATE:
CITY OF PACIFIC GROVE
SPECIAL CITY COUNCIL MEETING
Wednesday, May 23, 2012
“ACTION MINUTES”

CALL TO ORDER
Mayor Garcia, Councilmembers Kampe, Cohen, Cuneo, Fischer, Huitt and Miller in attendance.

14. UNFINISHED BUSINESS
Reference:  Thomas Frutchey, City Manager
Recommended Action:  
  1. Receive an update on the agreement to initiate and provide funding to establish a public/private partner relationship between Nader Agha/Moss Landing Commercial Park, LLC and the City of Pacific Grove.
  2. Provide direction on any remaining outstanding issues related to the agreement.  This preliminary agreement establishes the parameters and payment provisions for the completion of the second agreement.
  3. Direct staff to file application with the CPUC by May 25, 2012 with fees paid by Nader Agha.
Action: Upon motion of Councilmember Cuneo to accept Agreement with the exception of paragraph 15 (Indemnification) and through JPA process request other cities join with Pacific Grove formally, motion carried. 

ADDENDUM:
Paragraph 15 
4.15. Indemnification.  MLCP and Nader Agha, personally, agree to indemnify, defend, and hold City, its Council, officers, agents, and employees free and harmless from any 3rd party claims, demands, losses, costs, expenses, obligations, liabilities, damages, recoveries, and deficiencies, including attorney’s fees and costs, that such may incur as a result of a material breach by MLCP of its obligations under this Agreement.  

MLCP and Nader Agha further agree to indemnify, defend, and hold City, its Council, officers, agents, and employees free and harmless from any 3rd party claims, demands, losses, costs, expenses, obligations, liabilities, damages, recoveries, and deficiencies, including attorney’s fees and costs, resulting from such 3rd party’s property loss or personal injury that result from alleged negligence by MLCP in the performance of this Agreement.  The scope of indemnity for negligent acts herein shall be identical to the scope of coverage under standard California Commercial General Liability Insurance Policies.

MLCP agrees to maintain a policy of insurance to cover any negligent acts or a omissions committed by MLCP, its employees or agents giving rise to 3rd party claims of property loss or personal injury arising from and in conjunction with MLCP’s performance of this Agreement.  In order to support its indemnity obligations based upon claims of negligence  under this Agreement, MLCP agrees to maintain a policy of insurance of at least Two  Million Dollars ($2,000,000), and shall name City as an additional insured under such  policy.  City shall be given thirty (30) days prior written notice of the intent to change or chancel such coverage.  MLCP shall provide City with a certificate of insurance or other  evidence of such insurance coverage.  

Any obligation to Indemnify shall survive termination of this Agreement, if the alleged act  giving rise to liability occurred during the period during which this Agreement was in effect.

ABSTRACT:  The City of Pacific Grove’s May 16, 2012 City Council meeting was continued to Wednesday, May 23, 2012 at 6:00 P.M. for Open Session at City Council Chambers, located at 300 Forest Avenue, Pacific Grove.  An agenda item includes 14. UNFINISHED BUSINESS A. Agreement initiating a relationship with Nader Agha to develop a water project able to meet the needs of Pacific Grove and the Monterey Peninsula.  The AGENDA REPORT is embedded, including the Draft Agreement, dated May 21, 2012.  The RECOMMENDATION of Thomas Frutchey, City Manager, is as follows:
1. Receive an update on the agreement to initiate and provide funding to establish a  public/private partner relationship between Nader Agha/Moss Landing Commercial Park, LLC  and the City of Pacific Grove. 
2.  Provide direction on any remaining outstanding issues related to the agreement.  This preliminary agreement establishes the parameters and payment provisions for the completion of the second agreement. 
Importantly, the DISCUSSION states: Two specific areas of interest were negotiated over the past several weeks to ensure consistency with that principle:
• Assurance that the $600,000 Mr. Agha is committing to the development of the People Project’s EIR, permit applications, and other efforts will be available when needed; and
• Protection of the City in the event of lawsuits, regulatory requirements of the CPUC, Coastal Commission, or other permitting bodies, or any other unintended sources of expenses resulting from the City’s participation in the Project.
The attached revised agreement contains agreed-to wording in both areas.  This wording is in bold lettering.


Pacific Grove AGENDA REPORT 14a May 23_ 2012 -
AGENDA REPORT
Agreement initiating a relationship with Nader Agha to develop a water project able to meet the needs of Pacific Grove and the Monterey Peninsula 

Saturday, May 12, 2012

CITY OF PACIFIC GROVE CITY COUNCIL: Agreement initiating a relationship with Nader Agha to develop a water project able to meet the needs of Pacific Grove and the Monterey Peninsula


UPDATE:  The May 16, 2012 City of Pacific Grove City Council meeting has been continued to Wednesday, May 23, 2012 at 6:00 P.M. for Open Session at City Council Chambers, 300 Forest Avenue, Pacific Grove.  Regarding 14. UNFINISHED BUSINESS A. Agreement initiating a relationship with Nader Agha to develop water project able to meet the needs of Pacific Grove and the Monterey Peninsula
Reference: Thomas Frutchey, City Manager 
Recommended Action:
1. Receive an update on the agreement to initiate and provide funding to establish a public/private partner relationship between Nader Agha/Moss Landing Commercial Park, LLC and the City of Pacific Grove.
2. Provide direction on any remaining outstanding issues related to the agreement. This preliminary agreement establishes the parameters and payment provisions for the completion of the second agreement. 3. Direct staff to file application with the CPUC by May 25, 2012 with fees paid by Nader Agha.


ABSTRACT:  On Wednesday, May 16 2012 at 6:00 P.M., the City of Pacific Grove City Council will conduct a Regular Meeting; the REGULAR MEETING AGENDA includes an agenda item UNFINISHED BUSINESS, Agreement initiating a relationship with Nader Agha to develop a water project able to meet the needs of Pacific Grove and the Monterey Peninsula.  The Recommended Action:  Receive an update on the agreement to initiate and provide funding to establish a public/private partner relationship between Nader Agha/Moss Landing Commercial Park, LLC and the City of Pacific Grove and Provide direction on any remaining outstanding issues related to the agreement.  This preliminary agreement establishes the parameters and payment provisions for the completion of the second agreement. Importantly, the DISCUSSION states, as follows:

To qualify for the bond funding necessary for the People’s Project, the City and Mr. Agha must ensure that the CPUC directs Cal-Am to purchase the water produced by the People’s Project for conveyance to the ratepayers...
To appear in the CPUC proceeding, the City and Mr. Agha must obtain qualified legal counsel, bring that counsel fully up to speed, and ensure counsel has adequate time to develop well reasoned and persuasive pleadings.
One of the primary underlying principles required by the Council in the formation of the relationship with Mr. Agha is that the City’s General Fund and overall fiscal health not be placed at any risk. As of the completion of preparation of this agenda packet, on Friday, May 11, 2012, the proposed initial agreement is still being negotiated in two areas to ensure consistency with that principle:
• Assurance that the $600,000 Mr. Agha is committing to the development of the People Project’s EIR, permit applications, and other efforts will be available when needed; and
• Indemnification of the City, to protect the City in the event of lawsuits, regulatory requirements of the CPUC, Coastal Commission, or other permitting bodies, or any other unintended sources of expenses resulting from the City’s participation in the Project.
Relevant sections of the REGULAR MEETING AGENDA are reproduced and the AGENDA REPORT is embedded, including the FORMATION AGREEMENT BETWEEN THE CITY OF PACIFIC GROVE AND MOSS LANDING COMMERCIAL PARK, LLC.

CITY OF PACIFIC GROVE
CITY COUNCIL
SPECIAL AND REGULAR MEETING AGENDAS
Wednesday, May 16, 2012
Council Chambers – City Hall – 300 Forest Avenue, Pacific Grove, CA

REGULAR MEETING AGENDA

6:00 p.m.
CALL TO ORDER

Mayor Garcia, Councilmembers Kampe, Cohen, Cuneo, Fischer, Huitt and Miller

14.  UNFINISHED BUSINESS

Reference:  Thomas Frutchey, City Manager

Recommended Action:  
  1. Receive an update on the agreement to initiate and provide funding to establish a public/private partner relationship between Nader Agha/Moss Landing Commercial Park, LLC and the City of Pacific Grove.
  2. Provide direction on any remaining outstanding issues related to the agreement.  This preliminary agreement establishes the parameters and payment provisions for the completion of the second agreement
Pacific Grove Agreement initiating a relationship with Nader Agha to develop a Water Project

Friday, April 20, 2012

The People’s Moss Landing Water Desal Project

ABSTRACT:  Links to information about The Peoples’ Moss Landing Water Desal Project are provided; THE PEOPLE’S MOSS LANDING WATER DESAL PROJECT A Green Sustainable Project Report, including New Information and Independent Consultant Review, is embedded.

INFORMATION ON THE PEOPLE’S MOSS LANDING WATER DESAL PROJECT










THE PEOPLE’S MOSS LANDING WATER DESAL PROJECT
THE PEOPLE’S MOSS LANDING WATER DESAL PROJECT (March 2012)