SPECIAL CONDITIONS
1. The project plans submitted for building permit review shall comply with the City's Green Building Ordinance (CMC Section 15.54) and obtain a minimum of 17 points based on the Residential Green Building Checklist.
2. A geology report in accordance with CMC Section 17.20.170.C shall be prepared prior to building permit approval.
3. A storm water drainage plan shall be prepared prior to building permit approval. The drainage and erosion plan shall include applicable Best Management Practices and retain all drainage on site through the use of semi-permeable paving materials, French drains, seepage pits, etc. Excess drainage that cannot be maintained on site, may be directed into the City's storm drain system after passing through a silt trap to reduce sediment from entering the storm drain. Drainage shall not be directed onto Carmel Beach.
The AGENDA and Staff Report document is embedded.
CITY OF CARMEL-BY-THE-SEA
PLANNING COMMISSION
Special Meeting
Thursday, November 15, 2012
Tour – 1:00 p.m.
Meeting – 1:30 p.m.
City Hall
East side of Monte Verde Street
I. CALL TO ORDER AND ROLL CALL
Commissioners: Steve Dallas
Don Goodhue
Keith Paterson
Michael LePage, Vice-chair
Janet Reimers, Chair
VIII. PUBLIC HEARINGS
1. MP 12-1
City of Carmel
SW Scenic & Santa Lucia
Consideration of Design Review and Coastal Development Permit applications for the construction of a public restroom located in the Park (P-2), Archaeological Significance Overlay (AS) and Beach and Riparian Overlay (BR) Districts.
Planning Commission Special Meeting Agenda and Staff Report
11-15-12
No comments:
Post a Comment