Friday, April 24, 2015

PURE WATER MONTEREY GROUNDWATER REPLENISHMENT PROJECT DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE PURE WATER MONTEREY GROUNDWATER REPLENISHMENT PROJECT, APRIL 2015

ABSTRACT: Pure Water Monterey is an advanced water recycling project, jointly developed by two public agencies – Monterey Peninsula Water Management District (MPWMDand the Monterey Regional Water Pollution Control Agency (MRWPCA.)  Pure Water Monterey is a multi-benefitintegrated, regional solution that will provide a water recycling model for other regions in California.” Project Technology: “Pure Water Monterey will utilize secondary treated water pumped into the Advanced Treatment Plant which would be put through an additional four-step Advanced Water Treatment (AWT) purification process of Ozone (O3) Pre-Treatment, Membrane Filtration (MF), Reverse Osmosis (RO), and Oxidation with Ultra Violet Light (UV) and Hydrogen Peroxide (H2O2). These methods are commonly used in processing strictly regulated items for public consumption like baby food and bottled water. The purified water is near distilled quality and exceeds all drinking water standards.” 
PUBLIC REVIEW AND COMMENT PERIOD: The public review and comment period for the Draft EIR runs for 45 days, beginning April 22, 2015 and ending June 5, 2015.
Comments on the Draft EIR must be submitted in writing no later than 5:00 p.m. on June 5, 2015 to the mailing address, fax number, or email address listed below:
By Mail:  Monterey Regional Water Pollution Control Agency Administration Office
ATTN: Bob Holden, Principal Engineer
5 Harris Ct., Bldg D
Monterey, CA 93940
By Email: gwr@mrwpca.com
By Fax: 831-372-6178 (please also send a physical copy of the correspondence to ensure receipt).
The DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE PURE WATER MONTEREY GROUNDWATER REPLENISHMENT PROJECT document (without VOLUME 1 APPENDICES, Appendix A – Appendix Z) APRIL 2015 is embedded.

REFERENCES:
Fact Sheet (03-11-15)
Tri-Fold Brochure 03/11/15)
Meeting ScheduleEmail List
(without VOLUME 1 APPENDICES, Appendix A – Appendix Z) (1247 pages)
APRIL 2015
Prepared for:
Monterey Regional Water Pollution Control Agency in partnership with Monterey Peninsula Water Management District

REFERENCE:

Document/Report
Size
Date
64.5MB
04/22/15
451kb
04/22/15
3.33MB
04/22/15
2.32MB
04/22/15
26.1MB
04/22/15
415kb
04/22/15
4.  ENVIRONMENTAL SETTING, IMPACTS, AND MITIGATION MEASURES
 1.74MB
04/22/15
 3.97MB
04/22/15
 736kb
04/22/15
 3.02MB
04/22/15
 2.36MB
04/22/15
 1.64MB
04/22/15
 1.21MB
04/22/15
 7.62MB
04/22/15
 1.68MB
04/22/15
 3.73MB
04/22/15
 7.95MB
04/22/15
 2.64MB
04/22/15
 1.21MB
04/22/15
 1.60MB
04/22/15
 467kb
04/22/15
 606kb
04/22/15
 2.52MB
04/22/15
 1.52MB
04/22/1
 210kb
04/22/15
 2.31MB
04/22/15
 217kb
04/22/15
 35.3MB
04/22/15
 963kb
04/22/15
 582kb
04/22/15
 3.89MB
04/22/15
 1.06MB
04/22/15
 2.18MB
04/22/15
 5.48MB
04/22/15
 94.2MB
04/22/15
 58.0MB
04/22/15
 9.22MB
04/22/15
 20.8MB
04/22/15
 8.92MB
04/22/15
 2.63MB
04/22/15
 997kb
04/22/15
 16.9MB
04/22/15
 21.7MB
04/22/15
 4.56MB
04/22/15
 15.0MB
04/22/15
 1.46MB
04/22/15
 1.0MB
04/22/15
 3.46MB
04/22/15
 3.35MB
04/22/15
 2.64MB
04/22/15
 2.57MB
04/22/15
 1.75MB
04/22/15
 3.46MB
04/22/15
Other
 224kb
04/22/15

No comments: