Friday, September 11, 2015

RIO PARK/LARSON FIELD PATHWAY PROJECT DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION and RIO PARK/LARSON FIELD PATHWAY PROJECT DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION VOLUME II: APPENDICES

ABSTRACT: The RIO PARK/LARSON FIELD PATHWAY PROJECT DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION and RIO PARK/LARSON FIELD PATHWAY PROJECT DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION VOLUME II: APPENDICES document copies are embedded. The Lead Agency is the City of Carmel-by-the-Sea. Important selected excerpts:
Project Location
The project site is located south of Rio Road between Ladera Drive and Mission Fields Road, in both the City of Carmel‐by‐the Sea and unincorporated Monterey County, California.
Project Description
The proposed pathway is a shared‐use path suitable for pedestrian and bicycle travel linking Rio Road to Lasuen Drive. The path intersects Rio Road near the northeast corner of Larson Field; it intersects Lasuen Drive at the Mission Ranch tennis court driveway (see Figures 2a and 2b). The total length of the path is approximately 1,420 feet. Approximately 50 percent of the path alignment would be on what is currently bare dirt or disturbed land characterized by ruderal vegetation. Another 40 percent is turf and used as an active park with ball fields. The remaining portion of the proposed path crosses an area with willows, grasses, and other vegetation. Representative photographs of the project vicinity are shown in Figure 2c.
Review Period
September 11, 2015, through 4:00 p.m. on October 12, 2015
Comments
The City welcomes public comment on the project and on the analysis contained in this environmental Initial Study. Any individual, group, or agency wishing to make comments or ask questions related to the proposed project or the environmental analysis may submit them in writing to the City of Carmel‐by‐the‐Sea at the address listed above. The City will consider all comments received by 4:00 p.m. on October 12, 2015. The City also will receive oral comments at a public hearing conducted by the Planning Commission on September 23, 2015.
Determination
On the basis of this initial evaluation:
I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because revisions in the project have been made by or agreed to by the project proponent. A MITIGATED NEGATIVE DECLARATION will be prepared.

Rio Park-larson Field Pathway Project Draft Initial Study-mitigated Negative Declaration
CITY OF CARMELBYTHESEA
RIO PARK/LARSON FIELD PATHWAY PROJECT
DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
CITY OF CARMEL‐BY‐THE‐SEA
P.O. BOX G
E/S MONTE VERDE BETWEEN OCEAN AND 7TH
CARMEL, CA 93921
Prepared by:
Michael Baker
INTERNATIONAL
60 GARDEN COURT, SUITE 230
MONTEREY, CA 93940
SEPTEMBER 2015
CITY OF CARMELBYTHESEA
RIO PARK/LARSON FIELD PATHWAY PROJECT
DRAFT INITIAL STUDY/MITIGATED NEGATIVE DECLARATION
VOLUME II: APPENDICES
CITY OF CARMEL‐BY‐THE‐SEA
P.O. BOX G
E/S MONTE VERDE BETWEEN OCEAN AND 7TH
CARMEL, CA 93921
Prepared by:
Michael Baker 
INTERNATIONAL
60 GARDEN COURT, SUITE 230
MONTEREY, CA 93940
SEPTEMBER 2015

No comments: